This project had the objective to transport the largest amount of energy that allows the raise of the Yacyretá dam height to 82 m., the increase in energy exchange with Brazil, the interconnection of the new station to the Manuel Belgrano system of combined cycle and the increase in safety of the National Interconnected System. The south phase was in the hands of INTESAR and it was developed along 242,5 km. between Colonia Elía (Entre Ríos) and General Rodríguez (Buenos Aires). It included the enlargement of the transformer stations to 500 kV, Colonia Elía and General Rodríguez and the interconnection to Manuel Belgrano combined cycle power station. The execution of this phase has posed important challenges mainly given the flooding potential of large part of the area and the long distances between the river crosses of Paraná Guazú and Paraná de las Palmas. The execution of this phase has posed important challenges mainly given the flooding potential of large part of the area and the long distances between the river crosses of Paraná Guazú and Paraná de las Palmas.
|
|