EISA Energía is a member company of Grupo Eling, which is developing a project for the installation of a wind farm with a capacity of 25 MW. Grupo Eling, given its engagement with the environment, places renewable energies at the core of its strategic projects. The surveys and wind tests have been concluded and we estimate a period of two years before the start up of the engineering development and construction of our own Parque Eólico (Wind Park) and 25 years for its start up and maintenance. The farm will be located nearby the city of Río Cuarto in the south of province of Córdoba, and it will be equipped with aprox. 10 wind turbines. This project represents the first step of the company in this new area which will enable it to acquire the specific know-how to enter a market of immense potential growth both at a national and an international level. Moreover, EISA Energía is assessing different wind projects throughout the country (Santa Cruz, Córdoba, and Neuquén, among others). |
|