The execution of this project poses a special challenge given its location in the south of Patagonia. For this reason the project is performed with an adequate planning and logistics to allow its construction in a short time basis under such extreme weather conditions. The remaining stages (II, III and IV): 148 km of 220 kV between Esperanza and Río Turbio; 159 km between Esperanza and El Calafate, and 129 km between Esperanza and Río Gallegos have been commissioned to other national construction companies. |
|
PICO TRUNCADO –RIO GALLEGOS-RIO TURBIO – CALAFATE Interconnection